Copy of property damages 48 Winter St. Tree 5 Tree 6 Tree 7 Tree 8 Tree 9 Tree 10 Tree 13 Tree 14 Tree 22 Tree 23 Tree 24 Tree 27 Tree 28 Tree 29 Tree 30 Tree 32 Tree 31 Tree 40 Tree 41 Tree 46 Tree 48 Tree 49 Tree 50 Tree 51 Tree 52 Tree 53 Boiler room of powerhouse, sec.C EBT Air compressors sec.C EBT Lowering air lock, Sec C. EBT Lowering air lock, sec.A, EBT Lowering air lock, sec.A, EBT Getting ready to lower air lock sec.C, EBT Showing air lock for sec.C, EBT getting ready to lower same Interior view of a tunnel, 1902 Interior view of a tunnel with workers, possibly near an air lock Inside a tunnel with men at work on the right Concrete sheeting test section at Ames Building, Sec F EBT, Boston, Mass., December 27, 1902 Conduits, pipes, manholes etc., south side State St. at Brazer Building, Boston, Mass., December 24, 1902 Test of concrete beam #5 with 4 painted corr. rods 65 to 66 Long Wharf Building on south side of Long Wharf Building 22 to 27 Long Wharf Building 27 to 35 Long Wharf Building no. 68 & 69 Long Wharf Easterly end of Custom House block buildings on Long Wharf Cracks in southerly corner of Custom House block on Long Wharf Crack in wall of 12 Long Wharf north side of building Building no.57 Long Wharf