List View    Grid View

Displaying: 69601 - 69650 of 209,498

Beacon St. mall, Boston Common

1 gelatin dry plate glass negative

Beacon St. mall, Boston Common

1 gelatin dry plate glass negative

Beacon St. mall, Boston Common

1 gelatin dry plate glass negative

Shaft #1 and Beacon St. Mall, Boston Common, Boston, Mass., October 5, 1910

People sit on benches in Boston Common close to the construction site for shaft number one of the subway work.

Shaft #1 and Beacon Hill, Boston Common, looking southeast, Boston, Mass., October 5, 1910

The construction site for shaft number one of the subway is seen in the image. In the background the steeple of Park Street church can be seen on the left and to the right is the top of the Stearns Department store.

Shafts #1 and #2, Boston Common, looking southerly, Boston, Mass., October 5, 1910

The construction sites for two subway shafts can be seen in the image.

Shafts and overhead structure, Boston Common, looking east

1 gelatin dry plate glass negative

Shafts and overhead structure, Boston Common, looking west

1 gelatin dry plate glass negative

Shafts and overhead structure, Boston Common, looking north

1 gelatin dry plate glass negative

Shaft #2, Boston Common, looking northwest, Boston, Mass., October 5, 1910

The subway construction shaft on Boston Common can be seen looking in the direction of Beacon Street.

Shaft #3, Boston Common, looking east, Boston, Mass., October 5, 1910

The Stearns Department Store building on Tremont Street can be seen on the left beyond the Park Street subway station.

Shaft #3, Boston Common, looking northwest, Boston, Mass., October 5, 1910

The subway shaft next to Park Street Station on Boston Common can be seen.

Engineers' offices, Boston Common

1 gelatin dry plate glass negative

Engineers' offices, Boston Common

1 gelatin dry plate glass negative

Underpinning at Post Building

1 gelatin dry plate glass negative

Underpinning at Post Building

1 gelatin dry plate glass negative

Supporting a 30" water pipe over the tunnel during construction, looking n. w.

1 gelatin dry plate glass negative

Northerly drift, upper level, sta.21+50, sec.2, looking w.

1 gelatin dry plate glass negative

Northerly drift, lower level, sta.21, sec.2, looking w.

1 gelatin dry plate glass negative

Southerly drift, lower level, sta.20+50, sec.2, looking e.

1 gelatin dry plate glass negative

Heading and shield from upper deck

1 gelatin dry plate glass negative

Arch, looking east, sec.1

1 gelatin dry plate glass negative

Upper level, sta.22+25, sec.2, looking east

1 gelatin dry plate glass negative

Bracing, southerly drift, sta.20+50, sec.2, looking east

1 gelatin dry plate glass negative

Open cut in Common west of Old Subway, looking northerly

1 gelatin dry plate glass negative

Showing west sidewall of Old Subway, drifts, bracing etc.

1 gelatin dry plate glass negative

Showing west wall of Old Subway and drifts, looking east

1 gelatin dry plate glass negative

Excavating in open cut just west of Old Subway

1 gelatin dry plate glass negative

Excavating and drift under Old Subway

1 gelatin dry plate glass negative

Excavating beside and under Old Subway for New Station

1 gelatin dry plate glass negative

Northerly sidewall duift under Old Subway showing timbering looking east

1 gelatin dry plate glass negative

Timbering under west wall of Old Subway

1 gelatin dry plate glass negative

Arch at sta.21+39.50, sec.2, looking westerly

1 gelatin dry plate glass negative

Southerly part of arch at sta.21+39.50 looking westerly

1 gelatin dry plate glass negative

Northerly part of arch at sta.21+39.50, sec.2

1 gelatin dry plate glass negative

Bed of clear sand dividing mass of bolder, clay, till, sta.21+60, sec.2

1 gelatin dry plate glass negative

Supporting a 30" water pipe over the tunnel during construction, sec.2

1 gelatin dry plate glass negative

Building new station under Park St. station of Old Subway

1 gelatin dry plate glass negative

Arch lagging before waterproofing sta.22+50, sec.2

1 gelatin dry plate glass negative

Southerly half of arch after removal of centers sta.21+20, sec.2

1 gelatin dry plate glass negative

Excavating of the core of the tunnel, sta.20

1 gelatin dry plate glass negative

B.H. tunnel, sec.1, sta.2+40, looking westerly

1 gelatin dry plate glass negative

Beacon Hill Tunnel, sec.1, sta.16-50, looking easterly

1 gelatin dry plate glass negative

North sidewall sta.21+11-12, sec.2

1 gelatin dry plate glass negative

North sidewall sta.21+32-34, sec.2

1 gelatin dry plate glass negative

Sec.1, BH Tunnel from sta. 17, looking westerly

1 gelatin dry plate glass negative

Sec.1, BH Tunnel from sta. 18, looking westerly

1 gelatin dry plate glass negative

Sec.1, BH Tunnel, looking westerly

1 gelatin dry plate glass negative

Tremont Street sidewalk from Hamilton Place to Winter Street, Boston, Mass., March 30, 1911

Thomas Galvin is the florist at 124 Tremont Street and Hamilton Place. The Park Street Subway Station can be seen on the right side of the image.

Part of shield to be used for tunnel under Beacon Hill

1 gelatin dry plate glass negative